Bipole III – Transmission line – Survey
ODK Engineering provided survey services to Rokstad Power on approximately 700km of transmission line. Our survey services included construction layout, general topography, and quality assurance surveys. ODK Engineering dedicated nine surveyors throughout the construction of the project. A local First Nation assistant was assigned to three of our surveyors on each of the three sections of transmission line.